Changing the use of a premises in Singapore, say from a shop to a tuition centre or from an office to a restaurant, may need planning permission from the Urban Redevelopment Authority. A URA change of use application costs S$500 and generally takes 10 working days. Some uses in some buildings qualify for a Change of Use Lodgment instead, which costs S$150 and is approved on the spot. Some changes need no URA permission at all.
Everything below is taken from URA's and SCDF's own pages and from the Planning Act, linked at each point. Fees and conditions change, so treat the figures here as published on ura.gov.sg on 2 October 2026 and confirm them on URA's Changing the Use of Your Property page before you pay. URA's own advice is worth putting first: find out whether you need planning permission before committing to a tenancy or starting renovation works.
What counts as a change of use
The legal hook is the definition of development in section 3 of the Planning Act. Development covers building and engineering operations, and also "the making of any material change in the use of any building or land". Development needs planning permission. So a change of use is not a renovation question: you can change the use of a unit without touching a single wall, and still need permission.
Section 3(2)(h) then carves out the most important exception. Where a building is used for a purpose in a class listed in the rules made under section 61, using it for another purpose within the same class is not development. Those rules are the Planning (Use Classes) Rules, whose Schedule lists 18 classes, among them Class I shop, Class II office, Class III restaurant, Class VII light industrial building, Class X warehouse, Class XII child care centre, Class XV nightclub and Class XVIII commercial school. URA's circular on the 2016 revisions gives the practical version: a planning application is needed when the use moves from one Use Class to another, and is not needed within the same Use Class unless special planning conditions are imposed on the site. Any use outside the 18 classes is an "Unclassified" use, and moving into or out of one, or between two of them, also needs approval.
Section 3(3) adds some declarations that catch people out. Using a building originally constructed as a dwelling house for other purposes is a material change of use. So is using as two or more separate houses a building previously used as one. Running a business from a home is therefore a change of use in principle, which is why URA runs separate schemes for it, covered below.
When you do not need URA planning permission
Before you prepare an application, check whether your case falls into one of these:
- Same Use Class. Shop to shop, office to office, and other moves within one class of the Use Classes Rules, provided no special planning condition applies to the site.
- Authorised conversions in commercial buildings. URA states that no planning permission is required to convert between showroom, restaurant and shop in approved commercial premises of standalone commercial buildings, such as shopping centres, and of commercial podiums or blocks physically separated from residential uses, on sites zoned Commercial, Commercial and Residential, Hotel or White. The conditions: the premises was previously approved for commercial use and computed as commercial gross floor area, there is no special planning condition on allowable use, the change is for an individual unit rather than an en-bloc conversion, and you hold the licences the use needs before starting. Party-walled shophouses and shopflats are excluded.
- Land owned or leased by an agency. URA's Planning Permission page lists as authorised works the change of use in HDB commercial premises, change of use on land leased from SLA in accordance with the lease, and change of use for commercial premises in Business Parks on JTC land and in Community Centres managed by the People's Association. There the consent you need is the agency's, not URA's.
- A small home-based business. Under URA's Home-Based Business Scheme, residents may run small-scale businesses without URA's approval: operated by the owner, registered occupant or tenant, no non-resident employee, no signage, no heavy non-domestic equipment, no large-scale storage. URA's examples include small-scale baking, hairdressing and manicures, private tuition for not more than three students at a time, and freelance work.
- A home office, registered. The Home Office Scheme is not an exemption but a registration, with URA for private homes and HDB for flats. It allows the administrative functions of a business with up to two non-residents engaged, no customers visiting, and a fire extinguisher and smoke detector installed in the office area.
The three URA routes, side by side
If the change does need URA's decision, it goes one of three ways. URA's published figures:
| Route | Applies to | Fee | Decision |
|---|---|---|---|
| Change of Use Lodgment | Pre-identified uses in selected commercial buildings and the 1st storey of shophouses, where every lodgment condition is met | S$150 | Deemed approved on lodgment; approval letter emailed the same day |
| Change of use application | Everything else that crosses a Use Class and is not otherwise authorised | S$500, non-refundable | Generally 10 working days; longer if incomplete or other agencies are consulted |
| Renewal of use | An existing use approved on Temporary Permission | S$500, non-refundable | Generally 10 working days; submit within three months before expiry |
Fees as published on ura.gov.sg on 2 October 2026. Confirm before paying. URA also notes that SLA may collect a Land Betterment Charge for a change of use or a renewal, which is separate from these fees.
All three are submitted through GoBusiness Singapore, the government's licensing portal. A change of use application is assessed on the Master Plan zoning, the prevailing guidelines and the potential disamenity to neighbouring developments, and URA is explicit that it may be approved or disapproved.
Does your case qualify for lodgment?
The Change of Use Lodgment Scheme covers a short list of uses: gym or fitness centre, commercial school, pet shop or pet grooming, office, active ageing or senior care centre, social service facility or family service centre, and laundromat. It applies within standalone commercial developments and segregated commercial podiums on sites zoned Commercial, Commercial and Residential, Hotel or White, and at the 1st storey of shophouses zoned Commercial, Commercial and Residential or White. Upper storeys of shophouses need a full application. Office use is not eligible for lodgment where the first storey must carry activity-generating uses.
Every one of URA's conditions must hold. The ones that most often decide a case:
- The premises is approved for commercial use or computed as commercial gross floor area.
- The change does not increase the floor area of the development.
- The site is not subject to special planning controls, such as use restrictions or a retail quantum cap.
- The building is not a gazetted monument, and not a conserved building in the Historic Conservation Areas of Kampong Glam, Chinatown, Little India, Boat Quay, Blair Plain, Emerald Hill and Cairnhill.
- It is a unit-level conversion, not an en-bloc conversion of the building.
- No part of the premises comprises works that are unauthorised under the Planning Act.
- The proposed use has not already commenced, and the owner's written consent was obtained first.
The unauthorised works condition deserves attention in older units. An infilled void, a mezzanine added by a previous tenant, or a partition that turned two units into one can each take a premises out of the lodgment route, whatever the proposed use. Knowing what is actually in the unit before you lodge is cheaper than finding out afterwards.
Check the approved use first
Whether you need permission depends on what the premises is approved for today, which is not always what it is being used for. URA offers four ways to find out, in rising order of cost:
- URA SPACE shows the allowable and last approved uses for all shophouses and selected commercial and industrial properties, free. It also shows the Master Plan zoning and whether the address sits in an activity-generating use area.
- The Development Register holds URA's planning decisions from the year 2000 onwards, with downloadable decision notices.
- The Enquiry on Approved Use of Premises e-service costs S$54.50 including GST per enquiry, for a single unit. Per URA's FAQ, the reply is instant if the record is in the online database, and otherwise within 10 working days. For a premises with a unit number, the form asks for a floor plan of the level showing the exact location of the unit in relation to the other units. It tells you the approved use. It does not tell you whether a change can be allowed.
- Buy Planning Records (DC 15) sells copies of approved plans and certified true copies of the Grant of Written Permission. That is the route when you need the approved layout, not just the approved use; the building and structural plans sit with BCA, see BCA plan purchase.
Who applies, and what you submit
URA states that a change of use application can be submitted by the business owner, the landlord, a consultant or a Qualified Person. A Qualified Person is not mandatory for the URA application itself, which is a real difference from most building approvals. The owner's written consent is required whoever applies, and where the premises are leased from SLA, HDB or JTC, their consent as land owner is required too.
URA's list of supporting documents for a change of use application is short:
- Location plan. For multi-unit developments such as a shopping centre or a flatted factory, a plan showing where your unit sits within the development.
- Floor plan. A floor plan showing the proposed layout and usage of the premises.
- Owner's consent. The property or unit owner's letter of consent.
- Other documents, if applicable. A cover letter, and clearances from other agencies such as SCDF, LTA, NEA and PUB relevant to the proposed use.
A lodgment needs only the location plan and the owner's written consent. URA publishes sample location and floor plans on its change of use page, and a step-by-step GoBusiness guide dated 23 July 2026. The fee is not refunded if the application is refused, so an incomplete or inaccurate floor plan is the most expensive thing you can submit: URA says plainly that an incomplete submission takes longer.
Use-specific rules to read before you sign a lease
URA's Considerations for Property Use page sets out, use by use and building type by building type, whether a use needs no permission, can be lodged, needs an application, or cannot be allowed. A few that matter often:
- Restaurants. In commercial buildings, conversion between shop, showroom and restaurant is authorised, subject to the conditions above. In a Problematic Traffic Area the use is unlikely to be supported. In industrial buildings it cannot be allowed. URA expects adequate parking and sound proofing, and points to a joint NEA, HDB, SPF and URA noise mitigation guide for foodshops.
- Bars, pubs and nightclubs. A change of use application is needed in commercial buildings, and the use will not be supported in URA's exclusion areas, near residential developments, or in activity-generating use locations. They cannot be allowed in the Historic Conservation Areas or in industrial buildings. A nightclub also needs a Public Entertainment Licence from the Police Licensing and Regulatory Department, which URA says to obtain before committing to a tenancy or starting renovation.
- Commercial schools. Tuition centres, language, cooking, art, music and dance schools are eligible for lodgment in qualifying commercial buildings and 1st storey shophouses; otherwise a full application.
- Offices. Lodgment in qualifying commercial buildings; an office cannot be allowed as a use in its own right in an industrial building. Within an industrial unit, an office is an ancillary use, which brings in the next rule.
- Industrial units: the 60:40 rule. URA's Business 1 use quantum guideline requires at least 60% of the floor area of each strata-subdivided industrial unit to be used for industrial uses, with ancillary uses such as an ancillary office or meeting rooms taking no more than 40%. The same split applies across the development. Whether a fit-out complies is an area calculation, and it can only be as good as the floor areas it starts from.
- Short-term accommodation. Not a change of use you can apply for. URA's short-term accommodation page states that residential properties may not be used for stays of less than three consecutive months, and that anyone found guilty faces a fine of up to S$5,000 at minimum, with recalcitrant offenders taken to court. Serviced apartments, a distinct use with a minimum stay of seven days, cannot be allowed in commercial buildings or industrial buildings.
Temporary Permission and renewal
Some change of use approvals are granted on Temporary Permission rather than permanently. URA's Renewal of Use page requires a renewal application within three months before the Temporary Permission expires, at the same S$500 fee and the same 10 working day assessment. A renewal is evaluated on its merits and may be refused. URA's change of use pages do not publish a standard Temporary Permission term, so read the period on your own decision letter and diarise the renewal window from day one.
URA is the first approval, not the last
URA states that after a change of use approval you must apply separately for the permits and licences the use needs, giving as examples SCDF's fire safety clearance, an SFA foodshop licence and an ECDA childcare licence.
The SCDF step is the one with the most drawing work. SCDF's plan approval page lists among fire safety works the "change of use of a building or part of a building where the new use affects fire safety requirements", with converting an office to a childcare centre or a shop to an eating establishment as its examples. Those plans must be prepared and submitted by a Qualified Person, a registered architect or professional engineer, and the change of use is incorporated in the building plan submission rather than filed separately. A Fire Safety Certificate must be obtained before the premises is used or occupied, after a Registered Inspector has inspected the completed works. So even though URA does not require a QP, many change of use projects end up with one.
Structure is the other question to ask early. A new use can bring heavier loads than the floor was designed for: dense storage, compactus shelving, gym equipment. We have not found a BCA page that makes a change of use by itself a structural submission trigger, but if the fit-out alters the building or the loads, BCA's rules on alterations to existing buildings apply. Ask your QP, and see A&A works in Singapore for how those approvals sequence.
Operating without approval
A material change of use without planning permission is unauthorised development. Under section 12 of the Planning Act, the offence carries a fine of up to S$200,000 and a further fine of up to S$10,000 for every day the offence continues after conviction. A repeat offender faces the same fine or up to 12 months' imprisonment or both.
Where URA is prepared to let the use stay, regularising it costs a civil penalty on top of the processing fee. URA's civil penalty rates put change of use cases in Band I: one times the processing fee without an enforcement record, two times with one. Where URA considers the applicant tried to deceive it, the penalty can reach 25 times the processing fee or S$150,000, whichever is lower.
SCDF runs its own enforcement. Its April 2022 reminder says an unauthorised change of use draws a Notice of Offence requiring the area to be reinstated to its original use, or a QP engaged to meet the fire safety requirements. For serious offences the person responsible can be fined up to S$200,000 or jailed for up to 24 months or both.
Where the floor plan comes in
Most change of use applications are small, and most of the paperwork is consent letters. The one technical document is the floor plan: URA asks for one showing the proposed layout and usage, the approved use enquiry asks for one of the level, and SCDF's change of use plans are drawn by a QP on top of one. If the landlord can hand you a current, dimensioned plan that matches the unit, use it and stop here. We would rather say so than sell you a survey you do not need.
Measurement becomes worth paying for at a few specific points:
- There is no plan of the unit, or only a marketing sketch or a decades-old approved plan. See what to do when the floor plan is missing or wrong.
- The plan does not match the fit-out: walls moved, units combined, a mezzanine added. That matters directly, because a lodgment fails if any part of the premises comprises unauthorised works, and URA needs a layout that shows the premises as it will actually be used.
- An area has to be demonstrated rather than asserted: the 60:40 split in an industrial unit, a lodgment condition that the change adds no floor area, or a lease that prices by area. See gross floor area in Singapore for how floor areas are counted.
- The QP preparing the SCDF submission needs existing-condition dimensions to design against.
That is what a measured survey produces. 3D laser scanning captures the premises as it stands, and as-built documentation turns the capture into dimensioned floor plans with verified areas, which you or your consultant can mark up with the proposed layout for URA.
One boundary to be plain about: we produce drawings, not approvals. Volumet is not a Qualified Person and does not submit change of use applications. The application stays with the owner, the tenant, their consultant or their QP, and the SCDF plans with the QP. What changes is that the plan they submit matches the unit. Tell us the address, the current and proposed use, and what plans you already have and we will tell you whether a survey is warranted at all.