CORENET X update, from 1 Oct 2026 the mandate applies at GFA ≥ 5,000m², including major A&A.What changed
Learn

Singapore building records, plans and regulation.

Practical guides to the paperwork behind a building in Singapore, where the official drawings are held, what the regulators require, and what to do when the record does not match the building.

Regulatory triggers

The moments a building needs its drawings.

Most requests for as-built documentation start with a statutory obligation. These guides cover the regimes that create one, and where the boundary of a survey sits against a statutory role.

Missing the drawings these guides assume you have?

A measured survey produces a drawing set of the building as it stands today. Tell us the building, the floor area and what the drawings are for, and we will confirm scope and a quote.

Talk to us about a survey