CORENET X update, from 1 Oct 2026 the mandate applies at GFA ≥ 5,000m², including major A&A.What changed
Learn · Planning control

Plot ratio

Gross plot ratio is the number URA uses to cap how much floor area a site can carry. What it means, where to read it, how it becomes a GFA figure, and why the number on the Master Plan is a ceiling, not a promise.

Plot ratio, properly gross plot ratio (GPR), is a development's Gross Floor Area divided by its site area. URA fixes it for each site in the Master Plan. Multiply it by the site area and you get the most floor area the site can carry, before any bonus GFA. A GPR of 2.8 on a 10,000m² site means up to 28,000m² of GFA. URA is explicit that this is an upper bound that site conditions may stop you reaching.

The definitions below come from URA's development control handbook, its Master Plan 2025 gazette circular and its landed housing envelope guidelines, read on 25 November 2026. URA amends the Master Plan and its handbooks regularly, so let your Qualified Person confirm the figures for any site you are buying or designing.

The formula

Maximum GFA = Master Plan GPR × site area. Site area is measured between the survey boundary lines, which is why the land parcel's Certified Plan from SLA matters (see INLIS). URA's handbook adds one helpful rule: land set aside for drainage or road reserve that will be vested in the State may be included in the site area when computing GFA for the GPR. So the land you give up for a road widening does not automatically shrink what you can build.

The GFA side of the equation has its own rules: what counts, what is exempt, and the middle-of-wall measurement URA adopted in 2023. Those are in GFA. The two pages are halves of one calculation.

Reading the Master Plan

The current plan is Master Plan 2025, which URA gazetted on 1 December 2025 as the statutory land use plan for the next 10 to 15 years. Each site carries a land use zone, such as Residential or Commercial, and where the zone is density-controlled, a GPR figure. URA publishes the plan online, and the hard copy and the Written Statement are on view at The URA Centre.

The base plan is not the whole story. URA gazettes amendments to Master Plan 2025 through the year, some of which change a site's zoning or plot ratio, and lists them on its amendments page. Check both before relying on a figure, and check the date on any figure quoted to you by an agent or a listing.

Why it is a ceiling

URA's words: "The MP plot ratio is the upper bound" and it "may not always be achievable". The reasons URA gives are the ones that decide most feasibility studies:

  • the shape of the plot, site topography or ground conditions;
  • building setbacks;
  • building height controls; and
  • the technical requirements of other authorities.

So the GPR tells you the most you could ask for. Whether the site will actually take it is a design question for an architect, worked out against setbacks, height and the other agencies' rules.

Bonus GFA

Some floor area can sit above the Master Plan GPR through URA's incentive schemes. URA keeps the cumulative bonus within an overall budget of 10% above the Master Plan GPR, or the maximum allowable GFA of the development, and each scheme has its own sub-cap: 7% of proposed residential GFA for balconies, private enclosed spaces and private roof terraces, 1% for indoor recreation spaces. Bonus GFA already used cannot be carried over when the site is redeveloped. The detail sits in GFA.

Landed housing

Landed homes are controlled differently. Since 11 May 2015, URA's envelope control guidelines define the allowable building envelope for landed housing by storey height and setbacks. Landed housing may not exceed the 2-storey or 3-storey height control, or the storey height shown in the designated landed housing plan in the Master Plan, whichever is lower. The maximum building height is 12m in a 2-storey area and 15.5m in a 3-storey area. For a house, then, the questions are storeys, height and setbacks, not a GPR multiplication.

Existing buildings

For a building that already stands, the useful question is how much of the permitted GFA is already used. That needs the existing GFA, and the existing GFA needs drawings that match the building. In older buildings they often do not: enclosed balconies, infilled voids and mezzanines added over the years all count, and none of them may be on the approved plans. URA's GFA Verification e-service lets a Qualified Person check a building's GFA with URA, but it needs a CAD or BIM calculation plan to start from.

That calculation plan is where we come in. 3D laser scanning captures the building as it stands, and we deliver as-built drawings or a Revit model for your QP to compute from. The QP computes and declares the GFA and URA decides it; we make sure the drawing they work from matches the building.

Existing GFA, measured

How much GFA is already used? Drawings for your QP from S$300 per drawing.

We laser scan the building as it stands, enclosed balconies and added mezzanines included, and deliver dimensioned plans or a Revit model for your QP to compute the existing GFA from. The QP declares it; URA decides it.

Floor plan, 1,600 sqft homeS$1,800

Site scan plus one sheet. DWG and PDF, the colour point cloud, and one round of revisions.

Scan and modelS$3,000

Site scan, registration and a Revit model at LOD 200 of a single floor or small unit.

Per item
  • Site scan, up to 2,000 sqftS$1,500
  • Each drawing sheetS$300
  • Additional site visitS$450
  • Rush: half the delivery time+30%

What moves the price: floor area, the number of separate spaces, out-of-hours access, tripod or control work, and the deliverables list.

As-built documentation Scan-to-BIM 3D laser scanning

Frequently asked questions.

What is plot ratio in Singapore?
Plot ratio, or gross plot ratio (GPR), is the ratio of a development's Gross Floor Area to its site area. URA sets it for each site in the Master Plan, and it caps how much floor area can be built. A GPR of 2.8 on a 10,000m² site allows up to 28,000m² of GFA.
How do I calculate the maximum GFA from the plot ratio?
Multiply the Master Plan GPR by the site area. Site area is measured between the survey boundary lines, and URA allows land set aside for drainage or road reserve that will be vested in the State to be included when computing GFA for the GPR. The result is the ceiling before any bonus GFA, which is capped separately.
Can I always build up to the Master Plan plot ratio?
No. URA states that the Master Plan plot ratio is the upper bound and may not always be achievable, because of the shape of the plot, site topography or ground conditions, building setbacks, building height controls, or the technical requirements of other authorities.
Where do I find the plot ratio for a site?
On the Master Plan. Master Plan 2025 was gazetted on 1 December 2025 and can be viewed online on URA's website; each site carries a land use zone and, where applicable, a GPR. Amendments are gazetted regularly after that, so check URA's list of gazetted amendments for the site as well as the base plan.
Do landed houses have a plot ratio?
Landed housing is controlled mainly by storey height and envelope rather than by plot ratio. URA's envelope control guidelines, in force since 11 May 2015, cap landed housing at the 2-storey or 3-storey height control, or the storey height in the designated landed housing plan, whichever is lower, with maximum heights of 12m for 2 storeys and 15.5m for 3.
How much bonus GFA can sit on top of the plot ratio?
URA keeps cumulative bonus GFA within an overall budget of 10% above the Master Plan GPR, or the maximum allowable GFA of the development. Individual schemes have their own sub-caps, such as 7% of proposed residential GFA for balconies, private enclosed spaces and private roof terraces.

How much GFA is already used?

Send us the address and what you are planning. We will tell you whether measured drawings are needed before your QP can answer it.

Describe the building